How to Rig the Masts: Main Mast Head
Image 55 of 56
Back to Site
Shows the dead-eyes being put on the topmast shrouds, and the laniards being reeved through the dead-eyes. Note: Its best to put the lower shrouds on first, before the top shrouds.